WORK FORECAST

 

Week of Monday, January 15, 2018

All work locations and durations are subject to weather.

Sullivan Square

  • Investigation of existing underground utilities will continue throughout the area, during daytime hours.
  • The proposed work will reduce travel lane widths, but will not close any existing travel lanes. 

Route 16

  • Investigation of existing underground conditions, which was scheduled for last week but delayed due to weather conditions, will begin. 
  • Work will include snow removal (as needed) and soil borings by small crews working in isolated areas during daytime off-peak hours. 
  • The proposed work zones will reduce travel lane widths, but will not close existing travel lanes. 

Alford Street/Broadway (Route 99)

  • Roadwork will continue on Robin Street, Beacham Street and Dexter Street. Work will include curb removal, sidewalk removal, and drainage structure installation.
  • Work will require the closure of small lengths of one side of the roadway for short durations. There is no anticipated impact to truck traffic. 
  • Investigation of existing underground conditions will continue at the corner of Alford Street (Route 99) and Dexter Street.
  • Work will take place during daytime off-peak hours on Tuesday, January 16th. The proposed work zone will require the closure of the right lane of Alford Street, northbound.

Week of Monday, January 8, 2018

All work locations and durations are subject to weather.

Sullivan Square

  • Investigation of existing underground utilities will continue throughout the area, during daytime hours.
  • The proposed work will reduce travel lane widths, but will not close any existing travel lanes.

Route 16

  • Investigation of existing underground conditions will begin. Work will include soil borings and snow removal, as needed, by small crews working in isolated areas during daytime off-peak hours.
  • The proposed work zones will reduce travel lane widths, but will not close existing travel lanes.

Alford Street/Broadway (Route 99)

  • Roadwork will continue on Robin Street and Beacham Street. Work will include curb removal, hydrant relocation, and drainage structure installation.
  • Work will require the closure of small lengths of one side of the roadway for short durations. There is no anticipated impact to truck traffic.

 

Week of Monday, January 1, 2018

All work locations and durations are subject to weather.

Sullivan Square
Roadwork at Sullivan Square will resume on January 2nd

  • Investigation of existing underground utilities will continue throughout the project area.This work will take place during the day.
  • The proposed work zones will reduce travel lane widths, but will not close any existing travel lanes.

Route 16
Roadwork on Route 16 will resume in Sweetser Circle on January 3rd

  • Work will include the installation of new wheelchair ramps. This will be done with small crews working in small isolated areas during daytime off-peak hours.
  • The proposed work zones will reduce travel lane widths, but will not close existing travel lanes.

Alford Street/Broadway (Route 99)
Roadwork on Alford Street/Broadway (Route 99) and Robin Street and Beacham Street will resume on January 2nd

  • Work at the corner of Alford Street and Dexter Street will include tree removal and existing utility investigations.
  • This work will require the closure of the right lane of Alford Street northbound during daytime directional off-peak hours.
  • Work at Robin Street and Beacham Street will include curb removal, hydrant relocation, and drainage structure installation.
  • This will require the closure of small lengths of one side of the roadway for short durations. There is no anticipated impact to truck traffic.